Gault Museum
The Galt museum renewal and expansion incorporates a large public multi-functional
space and expanded environmentally controlled exhibition space enabling greater flexibility in programming and traveling exhibitions concurrent with that of permanent collections.
The expansion incorporates archive space and expanded vaults for the permanent collection.
The mechanical installations were being upgraded so as to improve on the control of environmental conditions to a museum standard of performance. Hemisphere Engineering is responsible for full mechanical engineering design services and contract administration. The project was completed in 2006.

