Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
    • Arts & Culture
    • Assisted Living / Continuing Care
    • Commercial
    • Educational K-12
    • Health Care
    • Law Enforcement
    • Military
    • Multi-Residential
    • Research, Science & Technology
    • Sports & Recreation
    • Transportation
    • University / College
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

Arts & Culture

Grande Prairie Public Library and art gallery TN
Grande Prairie Public Library & Art Gallery

The 100,000 square foot Grande Prairie Public Library and Art Gallery is a $26 million dollar project. Using an integrated design approach, the building systems were responsive to the desire for sustainable design with a life‐cycle cost perspective.
Completed: 2009 Construction Value: $26M

galtmuseumpreview.jpg
Galt Museum

The Galt museum renewal and expansion incorporated a large public multi-functional space and expanded environmentally controlled exhibition space enabling greater flexibility in programming and traveling exhibitions concurrent with that of permanent collections.
Completed: 2006 Construction Value: $5.2M

sirwinstonchurchillpreview.jpg
Sir Winston Churchill Square

Sir Winston Churchill Square, located directly across from Edmonton’s City Hall, is a premiere showpiece in Edmonton for a variety of artists and entertainers.
Completed: 2004 Construction Value: $5M

provarchivesinteriorpreview.jpg
Provincial Archives Of Alberta

Opened in the fall of 2003, Alberta’s new Provincial Archives is an 11,000 sq. m2 facility built on 17 acres of land.
Completed: 2003 Construction Value: $15M

winspearchamberpreview.jpg
Francis Winspear Center for Music

Compared to some of the finest halls, Edmonton’s Francis Winspear Center for Music has become the venue of choice for major artists and concert promoters from around the world because of the center’s superior acoustics.
Completed: 1997 Construction Value: $40M

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2013 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy