Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
    • Arts & Culture
    • Assisted Living / Continuing Care
    • Commercial
    • Educational K-12
    • Health Care
    • Law Enforcement
    • Military
    • Multi-Residential
    • Research, Science & Technology
    • Sports & Recreation
    • Transportation
    • University / College
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

Educational K-12

preview-archbishop.jpg
Archbishop Joseph MacNeil K-9 School

The school was constructed with nine classrooms, three science rooms, three ancillary classrooms, laboratory, gymnasium, business education and CTS Laboratory along with non-instructional support areas.
Completed: 2004 Construction Value: $5.1M

preview-st-augustine.jpg
St. Augustine of Canterbury School

The school was constructed with 16 instructional classrooms, two science rooms, four ancillary rooms, laboratory, gymnasium and non-instructional support space as well as a CTS area of 625 m2.
Completed: 2002 Construction Value: $7.2M

ecolevoyageurpreview.jpg
Ecole Voyageur

Completed in 2005, the school containes 14 classrooms, three CTS multi-lab and resource rooms, info server room, woodworking shop, CTS food/cafeteria, drama facility and large gym.
Completed: 2005 Construction Value: $7.4M

preview-jp.jpg
Jasper Place High School Modernization

This School serves a student population of 2,200 a $13M modernization enhanced areas such as automotive and welding shops, physical education change rooms, support spaces, computer studies, kitchen, classrooms, washrooms and corridors.
Completed: 2005 Construction Value: $13M

stjoespreview.jpg
St. Joseph’s Composite High School Modernization

St. Joe’s is ranked as one of Edmonton’s and Alberta’s most innovative learning facilities.
Completed: 1999 Construction Value: $19M

sttimothyspreview.jpg
St. Timothy’s School

This is a three-story school built into a hill. It has an underground water tank farm that stores both domestic and fire protection water.
Completed: 2004 Construction Value: $7.7 M

banffcommhspreview.jpg
Banff Community High School

The academic program offered at the Banff Community High School is available to students in grades 7-12.
Completed: 2000 Construction Value: $4.1M

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2012 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy