Sports & Recreation
- Cardel Place
The Center incorporates two public ice skating / hockey rinks, associated team change and shower rooms, three gymnasia, a major aquatic facility with associated change and shower rooms, therapy / fitness program areas, a public library, tenant rental space, and administrative public spaces.
Completed: 2004 Construction Value: $28M
- Bonnyville and District Centennial Center
This facility consists of a new arena added to existing, leisure ice, fieldhouse, 558 m2 fitness area, dressing rooms, future aquatics center and retail lease space.
Completed: 2008 Construction Value: $21M
- Kinsmen Aquatic Center
Hemisphere Engineering designed the original facility in the late 1970’s. The Kinsmen Aquatic Center $5M mechanical upgrade focused on providing superior air quality for a world class competitive swimming facility.
Completed: 2007 Construction Value: $12M
- Red Deer Recreation Centre
Renovation and addition project includes a major retrofit of the Red Deer Recreation Centre originally constructed in the 1960’s.
Completed: 2006 Construction Value: $9.5M
- Derrick Golf and Winter Club
The facility expansion included a new indoor lap pool, children’s pool, and whirlpool facility in place of the existing summer use outdoor pool.
Completed: 2000 Construction Value: $3.5M
- Telus Field
This State-of-the-art baseball stadium was constructed in 1994 at a cost of approximately $9M located in the river valley of downtown Edmonton.
Completed: 1994 Construction Value: $9M
- Black Gold Centre
The centre contains a pool, whirlpool, ice rink and offices. In 2003, Hemisphere Engineering were the electrical engineers responsible for a relighting project for the main pool and whirlpool.
Completed: 2003