Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
    • Arts & Culture
    • Assisted Living / Continuing Care
    • Commercial
    • Educational K-12
    • Health Care
    • Law Enforcement
    • Military
    • Multi-Residential
    • Research, Science & Technology
    • Sports & Recreation
    • Transportation
    • University / College
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

Sports & Recreation

preview-cardel-place.jpg
Cardel Place

The Center incorporates two public ice skating / hockey rinks, associated team change and shower rooms, three gymnasia, a major aquatic facility with associated change and shower rooms, therapy / fitness program areas, a public library, tenant rental space, and administrative public spaces.
Completed: 2004 Construction Value: $28M

preview-bonnyville.jpg
Bonnyville and District Centennial Center

This facility consists of a new arena added to existing, leisure ice, fieldhouse, 558 m2 fitness area, dressing rooms, future aquatics center and retail lease space.
Completed: 2008 Construction Value: $21M

preview-kinsmen-pool.jpg
Kinsmen Aquatic Center

Hemisphere Engineering designed the original facility in the late 1970’s. The Kinsmen Aquatic Center $5M mechanical upgrade focused on providing superior air quality for a world class competitive swimming facility.
Completed: 2007 Construction Value: $12M

red-recctr-lobbypreview.jpg
Red Deer Recreation Centre

Renovation and addition project includes a major retrofit of the Red Deer Recreation Centre originally constructed in the 1960’s.
Completed: 2006 Construction Value: $9.5M

preview-derrick.jpg
Derrick Golf and Winter Club

The facility expansion included a new indoor lap pool, children’s pool, and whirlpool facility in place of the existing summer use outdoor pool.
Completed: 2000 Construction Value: $3.5M

preview-telus.jpg
Telus Field

This State-of-the-art baseball stadium was constructed in 1994 at a cost of approximately $9M located in the river valley of downtown Edmonton.
Completed: 1994 Construction Value: $9M

preview-blackgold.jpg
Black Gold Centre

The centre contains a pool, whirlpool, ice rink and offices. In 2003, Hemisphere Engineering were the electrical engineers responsible for a relighting project for the main pool and whirlpool.
Completed: 2003

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.