Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
    • Arts & Culture
    • Assisted Living / Continuing Care
    • Commercial
    • Educational K-12
    • Health Care
    • Law Enforcement
    • Military
    • Multi-Residential
    • Research, Science & Technology
    • Sports & Recreation
    • Transportation
    • University / College
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

Kinsmen Aquatic Center

slideshow-kinsmen-pool.jpg

Hemisphere Engineering designed the original facility in the late 1970’s. The Kinsmen Aquatic Center $5M mechanical upgrade focused on providing superior air quality for a world class competitive swimming facility. The facility is to be equipped with a 100% outdoor air system with energy recovery to provide maximum air quality. Computational modeling of the air flow in the facility was carried out to optimize air distribution for spectator and swimmers.

Completed in 2007 at a construction value of approximately $12M

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2013 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy