Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
    • Arts & Culture
    • Assisted Living / Continuing Care
    • Commercial
    • Educational K-12
    • Health Care
    • Law Enforcement
    • Military
    • Multi-Residential
    • Research, Science & Technology
    • Sports & Recreation
    • Transportation
    • University / College
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

University / College

reddeercollegepreview.jpg
Red Deer College Healthy Communities Complex- Phase 1

The Red Deer College Building Communities Through Learning (BCTL) addition officially opened in June of 2009. The expansion includes classrooms, learning commons, visual arts studios, welding shops, automotive shops and manufacturing floor.
Completed: 2009 Construction Value: $29M

colenergyctrpreview.jpg
Portage College ( The Energy Center)

This new campus incorporates classrooms, lab space and offices to accommodate 280 full-time students.

medicinehatpreview.jpg
Medicine Hat College ( New Power Engineering Technology Lab)

This was a new lab facility for the Power Engineering Technology Program. The new facility is located on the main campus and attached to the main building at the Trades and Technology Wing.
Completed: 2009 Construction Value: $7.5M

nait-spartanctrpreview.jpg
NAIT Spartan Center for Instrumentation Technology

Renovation of an existing building on NAIT’s Main Campus from its current use as a welding instructional space to an instructional space for power engineering, welding and Building Environmental System Technology.
Completed: 2008 Construction Value: $45M

preview-nait-waiward.jpg
NAIT Waiward Center for Steel Technologies (Souch Campus)

Completed in the fall of 2006, this project is part of NAIT Centre for Apprenticeship Technologies (NCAT) initiative to create additional training facilities for various apprenticeship trades in Alberta.
Completed: 2006 Construction Value: $12M

preview-nait-hp.jpg
NAIT HP Center for Information and Communications Technology (Main Campus)

The NAIT hp Center for Information and Communications Technology officially opened in the fall of 2002 and accommodates the Continuing Education group that services 40,000 clients annually.
Completed: 2002 Construction Value: $39M

preview-killam.jpg
University of Alberta South Lab -Killam Center for Advanced Studies

South Lab is one of the original buildings on the U of A Campus constructed in 1915.
Completed: 2007 Construction Value: $10M

preview-uc-housing.jpg
University of Calgary Student Housing

The student housing project accommodates 400 students in a single five storey structure, plus a basement level with service and amenity areas.
Completed: 2000 Construction Value: $13.5M

U of L MarkinHall1 2 TN
University of Lethbridge, Markin Hall

Markin Hall is the new Management and Health Sciences complex at the University of Lethbridge. The project consists of 90,000 sq. ft. of teaching and faculty office space to support their problem and case based study programs.
Completed: May 2010 Construction Value: $41M

University of Calgary 8th and 8th4 TN
University of Calgary Downtown Campus ( 8th & 8th )

The existing 130,000 sq. ft., 6 storey building at 8th & 8th underwent a major renovation complete with new mechanical and electrical systems to accommodate the University of Calgary’s Downtown Campus. Upgrades were integrated with the overall building envelope and structural upgrades.

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2013 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy