Hemisphere Engineering

  • Home
  • About
  • Showcase
  • Employment
  • Contact
  • Commissioning
  • Facilities
  • High Containment
  • Life Sciences
  • Power Systems Group
  • LEED & Sustainable Design Services
  • Net Zero Energy Design & 2030 Challenge

University Medical Center- National Emerging Infectious Diseases Laboratories

bos-umc-ren-exteriorshowcase.jpg

The NEIDL facility is a 191,000 gsf housing state-of-the-art BSL-4 and BSL-3 biocontainment laboratories and associated BSL-2 laboratories, animal, insectary, clinical research, and research support space. It is located on the Boston University Medical Center campus. The facility will serve as a national resource for efforts in conducting clinical and laboratory (in vitro and vivo) research and testing on hazardous biological agents in support of the National Institute of Allergy and Infectious Diseases (NIAID) Biodefense agenda.

Hemisphere Engineering was responsible for overall management and coordination of engineering services. Specific design included: HVAC and mechanical systems, control systems, Biowaste and security systems. The biowaste treatment system is composed of three 1500 gallon steam sterilization tanks and treats approximately 9,000 gallons per day.  A 600 lb. tissue digester was be installed to dispose of animal carcasses from BSL-3 and BSL-4 spaces.

The major scientific components of the program include animal housing for animal research studies, cellular and animal imaging technologies for clinical specimen study and whole body imaging, core support laboratories for specimen processing and production, and basic biomolecular BSL-2 laboratories to conduct basic molecular microbiology research.

Completed in 2008

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2012 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy