A renovation and addition to an existing building in Tunney’s Pasture completed in 1995. Similar design considerations to the Canadian Science Center and design strategies were used up to and including Level 3 containment (controls and commissioning).

This project consisted of Biosafety Level 2 laboratories and Biosafety Level 3 laboratories housed within new and existing structures. All mechanical and electrical systems were designed, installed and commissioned to the requirements of the MRC Guidelines. The BSL-2 laboratories were designed on a generic laboratory module with modules combined and customized to suit the program user’s requirements while allowing flexibility for future change.
Completed in 1995 at a construction value of $20.9M

Browse Our Project Showcase

Facilities
Hemisphere’s award-winning engineering designs have been used in a host of facilities and a wide range of sectors.

Biological Containment
International leaders in the field of high containment facilities that keep people safe even when they’re working with the world’s deadliest viruses.

Life Sciences
Hemisphere consistently “leads the field” in cutting-edge engineering solutions.

Power Systems Group
Our combined EIPS personnel team is capable of utility engineering design, on-site consulting and more.

LEED & Sustainable Design & Services
Our commitment to sustainable design minimizes our footprint on the planet and uses resources wisely.
 

Commissioning
Commissioning is the act of bringing a project from static completion to dynamic completion.
Copyright © 2012 Hemisphere Engineering
Home / About / Showcase / Employment / Contact / Privacy